Business Process Maturity Assessment Methodology: An Adaptive Approach for Project-Surveying Activities
https://doi.org/10.37791/2687-0657-2025-19-3-107-122
Abstract
This article addresses the pressing issue of improving business process management systems within project and survey organizations amidst the ongoing digital transformation. It posits the necessity of developing a specialized methodology for assessing the maturity of business process management, one that accounts for the specific characteristics of this sector. The authors conduct an analysis of existing approaches to business process maturity assessment (CMMI, PEMM, COBIT), demonstrating their limited applicability to project and survey activities due to the high degree of project uniqueness and dependence on external factors. As a solution, a multi-criteria model for maturity assessment is proposed and developed, encompassing 22 criteria organized into 8 thematic groups, covering both managerial and technological dimensions. The research outcomes include the development of an adapted methodology for assessing the maturity of business process management, integrating managerial and technological facets of project and survey organizations' operations. Maturity levels for business processes are proposed, linked to specific digitalization tools. The study concludes that the developed methodology enables a comprehensive evaluation of the current level of business process management maturity, identification of problem areas, and determination of avenues for improvement. The theoretical significance of the research lies in advancing the theory of business process management as applied to project and survey activities. The authors highlight the practical significance in the potential use of the developed methodology for diagnosing business process management systems and making informed decisions on their improvement, with the aim of enhancing overall company efficiency. It is noted that the proposed methodology can serve as a basis for forming digital transformation strategies in the project and survey industry; however, its application requires consideration of regional regulatory features. The authors identify the integration of blockchain and IoT solutions to enhance the accuracy of project assessment and management in real-time as a promising direction for future research.
About the Authors
M. V. KurnikovaRussian Federation
Marina V. Kurnikova, Cand. Sci. (Econ.), Associate Professor at Regional Economy and Management Chair
Samara
D. S. Egorov
Russian Federation
Dmitry S. Egorov, Postgraduate, Regional Economy and Management Chair
Samara
References
1. Artemyeva S.I., Kublashvili G.S., Zaitsev A.G. The algorithm for applying the process maturity model to improve business processes in organization. Omskiy nauchnyy vestnik. Seriya: Obshchestvo. Istoriya. Sovremennost'=Omsk Scientific Bulletin. Series Society. History. Modernity, 2023, vol.8, no.3, pp.138-146 (in Russian). DOI: 10.25206/2542-0488-2023-8-3-138-146.
2. Astafyeva O. Methodology of Forecasting Business Processes in Industry in the Formation of Competitive Advantages in the Context of Ecosystem Interaction. Sovremennaya konkurentsiya=Journal of Modern Competition, 2025, vol.19, no.1, pp.91-107 (in Russian). DOI: 10.37791/2687-0657-2025-19-1-91-107.
3. Berezhnaya M.S. Training and development of multitasking specialists in a modern organization. Obshchestvo: politika, ekonomika, pravo=Society: Politics, Economics, Law, 2024, no.7(132), pp.99- 105 (in Russian). DOI: 10.24158/pep.2024.7.12.
4. Ilyina O. The organizational project management maturity model: Hierarchical model. Problemy teorii i praktiki upravleniya, 2009, no.7, pp.96-101 (in Russian).
5. Kabilova J.A., Sergeeva I.G. Assessment of the level of maturity of the quality management system by certification bodies. Nauchnyy zhurnal NIU ITMO. Seriya: Ekonomika i ekologicheskiy menedzhment=Scientific Journal NRU ITMO. Series "Economics and Environmental Management", 2021, no.4, pp.113-122 (in Russian). DOI: 10.17586/2310-1172-2021-14-4-113-122.
6. Karamyshev A.N. Assessment of process-based management system maturity in industrial enterprises. Vestnik Belgorodskogo gosudarstvennogo tekhnologicheskogo universiteta im. V.G. Shuhova=Bulletin of BSTU named after V.G. Shukhov, 2017, no.9, pp.202-207 (in Russian). DOI: 10.12737/article_59a93b115e7253.56924940.
7. Karanets S.M. Project management maturity models. Byulleten' innovacionnyh tekhnologiy=The Bulletin of Innovative Technologies, 2024, vol.8, no.2(30), pp.30-35 (in Russian).
8. Kurnikova M.V., Egorov D.S. Features of design and exploration as a management object. Problemy razvitiya predpriyatiy: teoriya i praktika, 2023, no.1-2, pp.176-180 (in Russian). DOI: 10.46554/PEDTR-22-2023-2-pp.176.
9. Kurnikova M.V., Egorov D.S., Mantulenko V.V. Modern technologies for modeling business processes in project and survey activity: Analysis and trends. Ekonomika, predprinimatel'stvo i parvo=Journal of Economics, Entrepreneurship and Law, 2024, vol.14, no.12, pp.7679-7694 (in Russian). DOI: 10.18334/epp.14.12.122398.
10. Pinchuk S.S. Approaches to assessing the maturity of processes in the transport industry. Transportnoe delo Rossii=Transport Business of Russia, 2022, no.1, pp.128-130 (in Russian). DOI: 10.52375/20728689_2022_1_128.
11. Repin B. Otsenka zrelosti sistemy upravleniya biznes-processami [Assessment of business process management system maturity]. Otkrytye sistemy. SUBD, 2020, no.1, pp.23-25.
12. Trifonov P.V., Aleksanyan O.B. Application of modern business process management technologies in industry. Ekonomika i upravlenie v mashinostroenii, 2020, no.4, pp.32-37 (in Russian).
13. Filippova O. A., Sabirov M. H., Matsapaev S. Assessing and analyzing the maturity of the enterprise business process management system. Ekonomika i predprinimatel'stvo=Economy and Entrepreneurship, 2024, no.7(168), pp.914-919 (in Russian). DOI: 10.34925/EIP.2024.168.7.182.
14. Khovrin N. A. Integration of strategic planning and business planning of project activities. Vestnik Samarskogo gosudarstvennogo ekonomicheskogo universiteta=Vestnik of Samara State University of Economics, 2023, no.12(230), pp.83-88 (in Russian). DOI: 10.46554/1993-0453-2023-12-230-83-88.
15. 1S:Smeta i Renga Professional. Komplekt reshenii dlya podgotovki smetnoi dokumentatsii na osnove TsIM [1C:Smeta and Renga Professional. Solution set for the preparation of cost estimates based on CIM]. 1С. Available at: https://solutions.1c.ru/catalog/resme/digital (accessed 16.04.2025).
16. Becker J., Knackstedt R., Poeppelbuss J. Developing maturity models for IT management: A procedure model and its application. Business & Information Systems Engineering, 2009, vol.1, pp.213-222. DOI: 10.1007/s12599-009-0044-5.
17. Dewi L., Wibowo A., Leander A. Business Process Maturity at Agricultural Commodities Company. In: Communications in Computer and Information Science: International Conference on Soft Computing, Intelligence Systems, and Information Technology. Berlin, Heidelberg, Springer Berlin Heidelberg, 2015, pp.505-513. DOI: 10.1007/978-3-662-46742-8_46.
18. Froger M., Bénaben F., Truptil S., Boissel-Dallier N. A non-linear business process management maturity framework to apprehend future challenges. International Journal of Information Management, 2019, vol.49, pp.290-300. DOI: 10.1016/j.ijinfomgt.2019.05.013.
19. Grofelnik I. Capability maturity model integration in medium sized manufacturing companies. Logistics Systems in the Global Economy: Proceedings of the XI of International Scientific-Practical Conference, 2021, no.11, pp.16-20.
20. Ouazzani-Chahidi A., Abdellatif L., Jimenez J., Berrah L. Maturity levels of management process for improving industrial performance. Scientific African, 2023, vol.21, article e01852. DOI: 10.1016/j.sciaf.2023.e01852.
21. Ongena G., Ravesteyn P. Business process management maturity and performance: A multi group analysis of sectors and organization sizes. Business Process Management Journal, 2020, vol.26, no.1, pp.132-149. DOI: 10.1108/BPMJ-08-2018-0224.
22. Röglinger M., Pöppelbuß J., Becker J. Maturity models in business process management. Business Process Management Journal, 2012, vol.18, pp.328-346. DOI: 10.1108/14637151211225225.
23. Van Looy A., Backer M., Poels G. A conceptual framework and classification of capability areas for business process maturity. Enterprise Information Systems, 2014, vol.8, no.2, pp.188-224. DOI: 10.1080/17517575.2012.688222.
24. Van Looy A., Backer M., Poels G., Snoeck M. Choosing the right business process maturity model. Information & Management, 2013, vol.50, no.7, pp.466-488. DOI: 10.1016/j.im.2013.06.002.
25. Van Looy A., Poels G., Snoeck M. Evaluating business process maturity models. Journal of the Association for Information Systems, 2017, vol.18, no.1, pp.461-486. DOI: 10.17705/1jais.00460.
Review
For citations:
Kurnikova M.V., Egorov D.S. Business Process Maturity Assessment Methodology: An Adaptive Approach for Project-Surveying Activities. Journal of Modern Competition. 2025;19(3):107-122. (In Russ.) https://doi.org/10.37791/2687-0657-2025-19-3-107-122